All About Substrate. A Blockchain Framework by Polkadot

Introduction “substrate” is defined as “the base on which an organism lives.” It’s an apt name for Polkadot’s developer toolkit, as the Substrate SDK provides developers a...

Security Incident Report: CrossCurve $3 million Cross-Chain Exploit

CrossCurve, a cross-chain liquidity protocol, recently experienced a significant security incident that resulted in the loss of approximately $3 million worth of assets across...
Axios Finance: Fixed-Rate Borrow & Lend Isolated Markets on Fuel

Axios Finance: Fixed-Rate Borrow & Lend Isolated Markets on Fuel

Introduction Axios Finance is a decentralized money market protocol built on the Fuel Network that enables fixed-rate, fixed-duration lending and borrowing through isolated markets. The entire Axios...

Truebit protocol $26 Million Hack Analysis

Truebit Protocol Hack: How $26M Was Stolen in 100% TRU Token Crash [2026 Analysis]

The Trust Wallet Extension Breach: Anatomy of a Supply Chain Attack

The recent Trust Wallet incident is really surprising. It was an unexpected attack in which the entire wallet extension was maliciously updated. Let’s break down...

Zk security A Comprehensive Engineering Guide to ZK Circuit Security BY...

Zero-Knowledge Proofs (ZKPs) have transitioned from theoretical cryptography to the backbone of blockchain scalability and privacy. However, this power comes with a terrifying caveat: silence. Unlike...

Hack Analysis: The USPD Hack (December 2025)

In December 2025, USPD, a stablecoin pegged to the US dollar, was exploited for a bit over 1 million dollars’ worth of assets. What...

Flow Blockchain: A Technical Deep Dive Into Its Architecture and Cadence...

Flow is a Layer-1 blockchain designed with a singular goal: to deliver high-throughput, developer-friendly infrastructure without relying on sharding or off-chain execution layers. Instead...

Understanding the Diamond Proxy Pattern (EIP-2535). Safe Edges

This article is written by the highly experienced security team at SafeEdges. Our team has successfully completed over 200 security audits, securing a total of...

Meet Moor: Fuel’s New Borrowing Engine Explained in Simple Language Secured...

The Fuel ecosystem is growing fast, and to support the next wave of DeFi projects, it needs strong financial building blocks. One of the...